1.Batch-Mode Water Usage: Set-Point: Time or pH
2.>2 Meter Long Gas Path: Calculated % DRE’s
Optional Wetted Inlets: to prevent clogging:
-Tungsten CVD
-Al Etch
Optional Chemical Inject: Max %DRE; Min. H2O Use
<10% Water Usage Water: >90% lower cost)
|